If a GPU came off the line today, how long until a finished card showed up on Tier 1 OEM X's doorstep?
IDK, but if a PCB had a date of manufacture, you could just subtract GPU's date of manufacture and add a week for transportation.
If a GPU came off the line today, how long until a finished card showed up on Tier 1 OEM X's doorstep?
The transition time between products is essentially zero: wafers lots are moved around from one machine to the next, tagged with bar codes. Machines get automatically configured accordingly.One of the assumptions built in, and the easiest way, I bet, to get "greater than 100% usage" is by running particularly large orders. One of the assumptions is going to be how much time you lose transitioning the fab from "GPU A" to "other customer B's ASIC".
http://www.eetimes.com/news/semi/sh...V0HCJH2QSNDLPSKHSCJUNN2JVN?articleID=19201721
Arithmatica, Inc., a company that claimed it could improve silicon performance and reduce die area with its innovations in mathematical circuit blocks, has revealed that Xilinx Inc. and Nvidia Corp. are two companies that have used its CellMath libraries.
The company's chief executive has also told Silicon Strategies that Arithmatica is already applying its technology to a 65-nm manufacturing process with a secret partner
If NVIDIA was plaining on using librarys that were migrating to 65nm, coupled with plans to hit 1 TFlop in the 4th Quarter of 2007.. Then it must mean they are going from 80nm -> 65nm, which means they need TSMC to do the processing.. Which means that if they finished 8600 way back in Q2 of 2006 then the next gen should be starting production about NOW.. Correct?
Sapphire Dual Radeon HD 2600XT:
http://www.pcgameshardware.de/screenshots/original/AMD_HD2000_Karten_aufstellung.PNG
http://www.pcgameshardware.de/?article_id=602063
Interesting...
edit:
original source is this document:
http://www.amd.com/us-en/assets/content_type/DownloadableAssets/ATI_Radeon_HD_2000_Handout.pdf
HD 2900XT with 1GB is also listed.
HD2600XT has the black box voucher.
Looks like sapphire scared now, and forget the UVD logo :smile:
HD2600XT has the black box voucher.
Looks like sapphire scared now, and forget the UVD logo :smile:
Is anyone other then GeCube bringing out CDDR4 card anytime soon?
Is it just me or does the "guy" on the 2400 boxes look more like a Girl with a Goatee?
Regards,
SB