That's certainly something only NVIDIA can answer, but the tape out for the GeForce chip should be the one we've been hearing about. The one that's slated for Q1 2010.
The "bigger" version, the one for Tesla with all the features designed for the HPC market, is slated for May 2010.
I highly doubt the presence of any other non GF100 chip for sale in Q1 if it hasn't taped out by now, even if it's a miracle A1 tapeout (nV starts at A1 not 0 right?).
So what Wavey said previously seems to be right. The memory chip itself is delaying the Tesla SKU of Fermi, and how well the chip is going on now, is still pretty much an enigma. Make no mistakes though, the probability of the highend Geforce (wastage and all) not using the Fermi Tesla chip is nearly 0%.